Laserfiche WebLink
Loader Worksheet Cont'd Task#05A Page 2 of 2 <br /> Total Travel Time: 0.4787 minutes <br /> Total Cycle Time: 0.9412 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 3.90 LCY(heaped) <br /> Bucket Fill Factor: 1.050 Other-moist loam (100-110%) 1.050 <br /> Adjusted Capacity: 4.10 LCY <br /> Job Condition Correction Factors <br /> Site Altitude:7800 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 261.04 LCY/Hour <br /> Adjusted Hourly Unit Production: 216.67 LCY/Hour <br /> Adjusted Hourly Fleet Production: 216.67 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 19.86 Hours <br /> Unit cost: $0.446 /LCY Total job cost: $1,917 <br /> CIRCES Cost Estimating Software <br />