My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-27_INSPECTION - M2013054
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2013054
>
2016-10-27_INSPECTION - M2013054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 1:21:27 AM
Creation date
10/31/2016 4:48:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013054
IBM Index Class Name
INSPECTION
Doc Date
10/27/2016
Doc Name
Returned Mail
From
DRMS
To
Boyce Land & Cattle Co., LLC
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#03A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Spread topsoil on pit slopes <br /> Site: Cotton Creek Pit Permit Action: 2016-10 Permit/Job#: M2013054 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 10/12/2016 County: Saguache Filename: M054-03a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $82.01 NA <br /> Operating Cost/Hour: $79.23 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.89 NA <br /> Total unit Cost/Hour: $200.13 <br /> Total Fleet Cost/Hour: $200.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 5,378 <br /> Swell factor: 1.000 <br /> Loose volume: 5,378 LCY <br /> Source of estimated volume: 1 a (a),8" <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 984.2 LCY/hr <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push gradient: -20% <br /> Average site altitude: 7,800 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.100 (CAT HB) <br /> Dozing method: 1.000 GEN. <br /> Visibility: 1.000 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.