Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Post inspection 10-4-16 update <br /> Site: Cotton Creek Pit Permit Action: 2016-10 Permit/Job#: M2013054 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 10/12/2016 County: Saguache Filename: M054-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> O1 a Dispose of debris DEMOLISH 1 3.00 $2.65 <br /> 02a Reduce pit slopes to 3:1 DOZER 1 0.94 $188.00 <br /> 03a Spread topsoil on pit slopes DOZER 1 8.86 $1,774.00 <br /> 04a Rip it floor and staging area RIPPER 1 4.52 $968.00 <br /> 05a Carry topsoil to pit floor LOADER 1 19.85 $1,917.00 <br /> 06a Spread topsoil on pit floor DOZER 1 3.26 $652.00 <br /> 07a Reve etate 5-acre disturbed area REVEGE 1 12.00 $2,661.00 <br /> 08a Haul reclamation equipment to and from site MOBILIZE 1 5.84 $3,755.00 <br /> SUBTOTALS: 58.27 $11,918 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $240.74 <br /> Performance bond: 1.05 Total= $125.14 <br /> Job superintendent: 0.00 Total= $0.00 <br /> Profit: 10.00 Total= $1,191.80 <br /> TOTAL O&P= $1,557.68 <br /> CONTRACT AMOUNT(direct+O&P)= $13,475.68 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $673.78 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $2,231.46 <br /> TOTAL BOND AMOUNT(direct+indirect)= $14,149.46 <br />