My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-27_INSPECTION - M2013054
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2013054
>
2016-10-27_INSPECTION - M2013054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 1:21:27 AM
Creation date
10/31/2016 4:48:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013054
IBM Index Class Name
INSPECTION
Doc Date
10/27/2016
Doc Name
Returned Mail
From
DRMS
To
Boyce Land & Cattle Co., LLC
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Post inspection 10-4-16 update <br /> Site: Cotton Creek Pit Permit Action: 2016-10 Permit/Job#: M2013054 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 10/12/2016 County: Saguache Filename: M054-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> O1 a Dispose of debris DEMOLISH 1 3.00 $2.65 <br /> 02a Reduce pit slopes to 3:1 DOZER 1 0.94 $188.00 <br /> 03a Spread topsoil on pit slopes DOZER 1 8.86 $1,774.00 <br /> 04a Rip it floor and staging area RIPPER 1 4.52 $968.00 <br /> 05a Carry topsoil to pit floor LOADER 1 19.85 $1,917.00 <br /> 06a Spread topsoil on pit floor DOZER 1 3.26 $652.00 <br /> 07a Reve etate 5-acre disturbed area REVEGE 1 12.00 $2,661.00 <br /> 08a Haul reclamation equipment to and from site MOBILIZE 1 5.84 $3,755.00 <br /> SUBTOTALS: 58.27 $11,918 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $240.74 <br /> Performance bond: 1.05 Total= $125.14 <br /> Job superintendent: 0.00 Total= $0.00 <br /> Profit: 10.00 Total= $1,191.80 <br /> TOTAL O&P= $1,557.68 <br /> CONTRACT AMOUNT(direct+O&P)= $13,475.68 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $673.78 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $2,231.46 <br /> TOTAL BOND AMOUNT(direct+indirect)= $14,149.46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.