Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> North River Pit M-1999-005 Rocky Ford South Pit M-1977-222 <br /> Lam." P's 4- MjU1-o1q 5t-.1WW.P 61rtv-eL Pif m a-VI a03� <br /> J&fhl-e(l G�rAv,,,t A4 4t M a0f4 Q2S 1 Vl-i aor�psi <br /> MO0ACq W 11t (" "07-y07 <br /> u <br /> prow Pi t M 90oq.p54C <br /> rhDOnat 5V4 A14u,,,rA f i+ 14 2oa•yjy <br /> u <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> z <br /> esso not a ee, the Division will render its decision within 30 days. <br /> Ihave reviewed the information provided in this Application <br /> ermitt Packet, as well as the applicable Act and Rules. Having been fully <br /> p informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospectiv Successor MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> http://mining.state.co.us/Minera]%20Fon-ns.htm). <br /> - 6 - <br />