Laserfiche WebLink
1 /// he <br /> e8f <br /> he <br /> 416Pe J <br /> I <br /> EXHIBIT E—FINAL CONTOUR PLAN <br /> OPERATOR— Washington County Road and Bridge District#3. <br /> SCALE 1"=200' <br /> CONTOUR INTERVAL- 10, <br /> DATE October 10,2016 <br /> SECTION 5,NE 1/4 <br /> TOWNSHIP 5S <br /> RANGE 49 W <br /> COUNTY Washington County <br /> PREPARED BY <br /> Laybourn Pit <br />