Laserfiche WebLink
!g <br />October 26, 2016 <br />NEW ELK COAL <br />COMPANY <br />Robin Reilley <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St. <br />Denver, CO 80203 <br />Re: New Elk Mine Permit No.: C-1981-012 <br />Permit Renewal 6 (RN -06) <br />Response to Fourth Adequacy Review <br />Dear Ms. Reilley: <br />OCT <br />M1INING r, ; p S� ETY' CN <br />This response consists of comments regarding and addressing questions <br />identified in Robin Reilley's letter dated 7 September 2016. Where appropriate <br />or required changes to the permit are referenced and submitted as attachments <br />to this letter. <br />The pagination of Section 2.05 has been reviewed and corrected where <br />necessary: <br />• Pages 1-74 are numbered in the top right corner of the page. These <br />pages are from a word document submitted in pdf format. <br />Pages 75-102 are scans of the approved pre -TR -68 text with revised page <br />numbers shown in the footer. Other than pagination and reference to RN - <br />6 in the footer, there are no other changes within this section. <br />Pages 103-115 are numbered in the top right corner of the page. These <br />pages are from a word document submitted in pdf format. <br />12250 Hwy 12 I PHONE (719) 859-0111 <br />Weston, CO 81091 FAX ((719) 868-0044 <br />E-MAIL ronthompson@newelkwal.wm <br />