Laserfiche WebLink
NORTH FORK GUNNISON RIVER <br />O, -'- 50 100 <br />SCALE IN FEET <br />I Fr EN STING MAJOR CONTOUR <br />EXISTING MINOR CONTOUR <br />EXISTING PAVED ROAD <br />EXISTING DIRT ROAD <br />EXISTING GUARDRAIL <br />EXISTING FENCE UNE <br />\ `\`•\ - - - - - .. , ,., , _ �. TREE LINE <br />` � I <br />\ - ---- - - - - -- EDGE OF WATER <br />EDGE OF ROAD -\ SEEPAGE <br />EXISTING SEDIMENT POND \ AREA ENCOUNTERED <br />\ \ I f'IWY 133 DRAINAGE BLANKET <br />DRAINAGE BLANKET PIPE ____-____ DRAIN PIPE <br />OUTLETS <br />1 DRAINAGE <br />APPROXIMATE DIVIDE BETWEEN <br />THE WEST AND EAST SLIDE AREAS _ / <br />- \ \ DRAINAGE BLANKET . LIMITS OF SECTION CTTfJ <br />\, - _ EXISTING CULVERT , <br />16"0 SOLID -WALL \ 1 - INTERCEPTOR TRENCH DRAIN ,� _V_,, ,, , ,-r ' -r SECTION IDENTIFIER SECTION VIEW CALL OUT <br />-HDPE PIPE 1 F_5 SLOPE AT 2% MIN. TO OUTLET 1 \ <br />APPROXIMATE BOUNDARY - - - - <br />HR -1 DESIGN CL OF WEST SLIDE AREA - \ APPROXIMATE BOUNDARY - F-02 <br />_ 6125 _ - -- - OF EAST SLIDE AREA - SECTION REFERENCES <br />_ _ - SHEET SECTION IS LOCATED ON <br />3+INTERCEPTOR _ - - _ _S - - \ --_� - TEF' DENOTES FIGURE) <br />TRENCH DRAIN <br />- (• <br />WEST AREA BLANKET 16"0 SLOTTED- __ - --OUTLET TO SEDIMENT DITCH <br />HDPE DRAINAGE PIPE 6150-- <br />_ X00 EDGE OF R.0 W. <br />_ 75 - - _ - \ "� �, ,AREA OF MAJOR SEEPAGE ENCOUNTERED ' <br />DURING EXCAVATION (TYP.) - <br />_82 - O'-_,457± MIN SLOPE "�'}M1 \ \�\ _ - `� NOTES: <br />+ - - µ - - - - - `� \ <br />CTOURS IN THE SLIDE <br />RESENT <br />_ - \ MIN, 'Y� <br />SLOPE -' _ _ _ - - - ,,.�' •,_L _ - �\� 1 N- PROGRESS XCAVATIIONATO THEPBEDROCK <br />-/ EA <br />45%f <br />\��y8+00 9+00� v =. - BENCH. <br />1+00 <br />1 00 �o t <br />N DEPICT <br />+ 474 2. EXISTING GROUND CONTOURS SHOW <br />—6225 - _=12+oo PRE -CONSTRUCTION CONDITIONS. <br />DAN\ <br />APPROXIMATE TRANSITION <br />FROM CHIMNEY DRAIN TO - <br />- DRAINAGE BLANKET 3x00 ` <br />6250 <br />12'0 SOLID WALL HDPE DRAINAGE PIPE <br />—6350 - 6275 <br />� <br />EXTENT OF DRAINAGE _ _ ----�— <br />MATERIAL APPROXIMATED - - _ - - �i 16 <br />CLEARWATER - <br />� DIVERSION DITCH <br />19+00 _ 18+00 <br />20+00 <br />- - _- ESTIMATED MAIN SEDIMENT <br />OUTLET DITCH - - <br />--- - - 6300 , 1 <br />r <br />23+00 - - - - - - - - I I CULVERT - <br />Az <br />6350 - - - - 10"0 SLOTTED HDPE PIPE - ---r- --- - •' - --- <br />\ t 1 <br />WITHIN DRAINAGE MATERIAL <br />HR_1 - - -- - -\ \ \ \\ 76,AOp� <br />1 PLAN: HAUL ROAD SLIDE LAYOUT <br />I HEREBY CERTIFY THAT THIS P AN, SPECIFlCATION, LIENT — Prom o hoe S.W. AS SHOWN BARR PROJECT NO. <br />OR REPORT WAS PREPARED Br ME OR UNDER MY HAUL ROAD LANDSLIDE REMEDIATION <br />DIRECT SUPERVISION AND THAT I AM A DULY I BARR ENGINEERING 00. Dot• 03/19/12 (� 06/26-1003.06 <br />P LICENSED PROFESSIONAL ENGINEER UNDER THE CONSTRUCTION BARR 4700 WEST 77TH STREET Drawn MOUNTAIN COAL COMPANY L.L.C. WEST ELK MINE <br />u LAWS OF THE STATE OF COLORADO RECORDMINNEAPOLIS, MN. MRP CLIENT PROJECT No <br />s SIGNATURE 55435-4803 sneaked SOMERSET, COLORADO SLIDE AREA <br />Corporate Headquarters Ph: 1-800-632-2277 Designed DWG NO REV. No. <br />PRINTED NAME RELEASED JAB C2 3 Minneapolis, Minnesota Fax (952) 832-2601 <br />E <br />NO. HK DATE REVISION DESCRIPTION DATE REG No TO/FOR DATE RELEASED Ph: 1-800-632-2277 ww.barrcom Approved PLAN FIGURE 4 A <br />