Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street <br />BARR Minneapolis, MN 55435-4803 LOG OF BORING B-1 <br />� Sheet 2 of $ <br />Project: Proposed RPE Expansion <br />Location: West Elk Mine, Somerset, <br />Client: Mountain Coal Company <br />CO <br />Barr Project Number: 06/261003 <br />STANDARD PENETRATION <br />NATURAL DRY <br />iu <br />TEST DATA <br />DENSITY <br />d <br />w <br />o <br />\ <br />N in blows/ft o0 <br />(pcf) it <br />o <br />w(D <br />MATERIAL DESCRIPTION <br />> <br />10 20 30 40 <br />105 115 125 <br />in <br />a <br />(ASTM D2488) <br />L <br />CL <br />� z <br />> <br />Q <br />2 n~. o <br />SHEAR STRENGTH, ksf <br />Water Content, % <br />LLI <br />E U) <br />OP X UC A TV )K <br />WP WN W� <br />U) <br />VS A VSR O <br />1 2 3 4 <br />20 40 60 <br />30 <br />SANDSTONE Red and tan/grey sandstone. <br />6160 <br />: ; <br />59% <br />SILTSTONE Medium -dark red and brown siltstone and altered 34.0 <br />x X <br />35 <br />shale. <br />x x <br />X X <br />X X <br />X x <br />X x <br />6155 <br />X x <br />x X <br />X X <br />O% <br />X X <br />X X <br />X X <br />X X <br />40 <br />X X <br />X X <br />x x <br />X X <br />X x <br />X x <br />X x <br />6150 <br />X x <br />x x <br />x X <br />0% <br />X x <br />X x <br />X x <br />X x <br />X x <br />45 <br />X x <br />X X <br />X x <br />X x <br />X x <br />X x <br />6145 <br />X x <br />X X <br />0% <br />X X <br />X x <br />X x <br />X x <br />X x <br />50 <br />X x <br />X x <br />X x <br />X x <br />X x <br />6140 <br />X x <br />X X <br />X <br />X X <br />$ <br />8%X <br />X x <br />X X <br />X X <br />X x <br />55 <br />X X <br />X x <br />I <br />X x <br />X x <br />X x <br />X x <br />6135 <br />X X <br />X X <br />7% <br />x x <br />� <br />X x <br />xx <br />X <br />Xx <br />60 <br />Continued NextPage <br />Completion Depth: 75.0 <br />Remarks: <br />Date Boring Started: 6/25/09 <br />Date Boring Completed: 6/25/09 <br />SAMPLE TYPES <br />WATER LEVELS <br />Logged By: BWL <br />m Auger Cutting ' Shelby Tube <br />While Drilling: <br />Drilling Contractor: Haztech <br />Drilling Method: HSA/CORE <br />End of Drilling: <br />Northing: 403263.5 <br />® Split Spoon � Rock Core <br />Eastin : 1450468.5 <br />hrs After Drilling: DR <br />The stratification lines represent approbmate boundaries. The transition may be gradual. <br />