My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-25_REVISION - M1993059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993059
>
2016-10-25_REVISION - M1993059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:40 PM
Creation date
10/26/2016 10:17:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
REVISION
Doc Date
10/25/2016
Doc Name
Request for Technical Revision
From
Midwestern Farms
To
DRMS
Type & Sequence
TR5
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E — Reclamation Plan <br /> This reclamation plan has been modified from the original as follows.Additions are denoted by bold <br /> text.Dek4iensl . <br /> 1.General Reclamation Plan <br /> A ,the total pefmit aFea ef 1479.2 ac-Fes is divided inte 6 mining phases as <br /> sf;evf�a sn ck�+bit{-2. <br /> The-acreage of the 64*iases-a"hewn-ems Map-E*Wbit C 2,are asfollews: <br /> Phase 1:221.6 Ae Phase 4i 128.3 a <br /> Phase 2- 134 O Phase 5• 202.7 a <br /> -7tc�c�-s.. sv-r.v�c <br /> Phase Z. 125.1 aE Phase--&45"-ac <br /> The tetal of these 6 aFeas plus the plaR!aFea of 49.2 aeFes WFFespends to the total distuFbed aFea of 04e <br /> At the completion of mining,only the Phase 1 area was mined,and the extents of that mining area <br /> extended to the south and east beyond the delineated area in the Exhibit C-2 referenced in the <br /> original reclamation plan.The revised areas are as shown in the table below. <br /> Area Description Total Post-mining Post- Post- Post-mining <br /> Acreage Rangeland Ac mining mining Industrial Ac <br /> Lake Ac Wetland Ac <br /> Plant Site 49.2 0.0 0.0 0.0 49.2 <br /> Phase 1 221.6 i85-4 _ 3" _ 6.4� _ 0.0 <br /> _ 414 372 +/-94 <br /> $38 �9 _ 4 <br /> P4ase-3 424 494-7 4" 3-S <br /> Abase 4 3222 3Q-�44 1-7-4 <br /> Phase-S 202.7 4694 --244 - -- --Phase 6 166:9 139.E 24-4 43 9 9 <br /> Totals 1^� 81&8 130. 2" 49.2 <br /> 463.2 372 +/-94 0 <br /> The pre-mining use of the entire property is ditch-irrigated agriculture and associateds-farm access <br /> roads to various fields. <br /> Map Exhibit F has been revised to show the final reclaimed lake and land use.-These revisions reflect <br /> the preferred reclamation by the Division of Parks and Wildlife staff,which is the intended final owner <br /> of the property.-shows <br /> lakes,Faeh phase will have two <br /> phase.The lakes-will be approximately 60 feet deep at thek its deepest <br /> point and will receive water through the alluvium in the floodplain.Water rights issues are discussed in <br /> Exhibit G-Water Information.The sideslopes of the lake will be reclaimed to a final slope ranging from <br />
The URL can be used to link to this page
Your browser does not support the video tag.