Laserfiche WebLink
Exhibit L-Estimated Reclamation Costs <br /> Re: Midwestern Farms Pit, Prowers County, CO <br /> File No. M-1993-059 <br /> Item Units Quantity Unit Cost Total Cost <br /> 64.2 Ac. In NW * <br /> (area may require reseeding) <br /> Regrading: Acre 64 $146 $9,391 <br /> Re-topsoil: Acre 64 $1194 $76,646 <br /> Reseed: Acre 64 $991 $63,662 <br /> 179 Acres in middle** <br /> Topsoil: Acre 141 $1194 $168,335 <br /> Seeding: Acre 141 $991 $139,696 <br /> Rip Plant Area Acre 40 $303 $12,120 <br /> Temp irrigation Acre 141 $200 $28,200 <br /> Fertilizer: N/A <br /> Mowing: N/A <br /> Shoreline Grading: LCY 2522 $0.136 $342.92 <br /> Remove Area Between <br /> Two Ponds: LCY 10,933 $0.136 $1,486.93 <br /> Wetlands Planting: N/A <br /> Disturbed Outer Edges 50 Acres*** <br /> Weed Control: Acre 50 $200 $10,000 <br /> Rip 2'depth: Acre 50 $303 $15,150 <br /> Topsoil: Acre 50 $1,194 $59,693 <br /> Seeding: Acre 50 $991 $49,550 <br /> Subtotal: $634,272.85 <br /> Indirect Costs <br /> Liability Insurance: $14,468.35 <br /> Performance Bond: $0 <br /> Job Supervision: $3270 <br /> Profit: $0 <br /> Reclamation Management: $40 657 <br /> Total Indirect Costs: $58,395 <br /> TOTAL BOND AMOUNT: $692,667.85 <br />