My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-25_REVISION - M1993059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993059
>
2016-10-25_REVISION - M1993059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:40 PM
Creation date
10/26/2016 10:17:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
REVISION
Doc Date
10/25/2016
Doc Name
Request for Technical Revision
From
Midwestern Farms
To
DRMS
Type & Sequence
TR5
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION MINING AND SAFETY <br /> 1313 Sherman Street, Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> ✓File No.: M- 1993-059 site Name: Midwestern Farms Pit <br /> P rowe rs <br /> County TR#_0� (DR�l1S Use only <br /> /Permittee: Midwestern <br /> 1016 ) <br /> Fa ENVISION rms T � <br /> OF <br /> Operator(If Other than Permittee): Eastern Coloraddwl r►gaV (ECA) <br /> Permittee Representative: Leonard Read <br /> Please provide a brief description of the proposed revision: <br /> Reducing depth of top soil, eliminating tree planting, eliminating wetland planting, reducing <br /> area to be top soiled and seeded at request of CPW, <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days, if the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. if at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 '� <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br /> �l Annual Fee and Report-CW <br /> �1 No Violations <br />
The URL can be used to link to this page
Your browser does not support the video tag.