Laserfiche WebLink
natural ravine. Storm water infiltration will occur within 72 hours of the precipitation <br /> event. All BMPs will be temporary and will be removed during reclamation. <br /> The target deposits are naturally stratified, during formation. This stratification <br /> creates relief, on a horizontal plane. Drilling, hydraulic breaking, and expansive agents <br /> will be used to continue mining the deposits. Incendiary agents (expansive gases) <br /> and small, isolated explosive cracking or fracturing will only be conducted by qualified <br /> personnel. <br /> 5 <br />