Laserfiche WebLink
New Adequacy Review Items <br />6. Table 2.04.7 -TI I submitted with the adequacy response letter was revised to not <br />include the checkmarks that indicate when flow rate will be monitored at the surface <br />water monitoring sites. Please update this table to indicate when flow rate will be <br />monitored. <br />a. PSCM has updated Table 2.04.7-T11 to include checkmarks. The updated <br />table is included with this submittal as an attachment, page 2.04-107. <br />PSCM hopes the Division finds these responses to be adequate and helpful in making their final decision <br />on TR09. If there are any further questions or concerns please do not hesitate to call me at 970-870-2718 <br />or email me at mblomquist@peabodyenergy.com. <br />Sincerely, <br />1 Y W1G�tp� <br />Miranda Blomquist <br />Engineering Technician - Environmental <br />Peabody Energy <br />Peabody Sa,-e Creek Mine <br />29515 Routt County Road 27 1 Oak Creek, CO 80467 1 970-870-2700 <br />