Laserfiche WebLink
Peabody Sage Creek Mining, LLC. <br />Page 2 <br />October 25, 2016 <br />quality parameters Semi -Annually not annually. Please update this table to reflect the <br />currently approved monitoring schedule. <br />New Adequacy Review Items <br />6. Table 2.04.7-T1 I submitted with the adequacy response letter was revised to not include the <br />checkmarks that indicate when flow rate will be monitored at the surface water monitoring sites. <br />Please update this table to indicate when flow rate will be monitored. <br />a. PSCM Response: PSCM has updated Table 2.04.7-T 11 to include checkmarks. The <br />updated table is included with the submittal as an attachment, page 2.04-107. <br />b. DRMS Response: Item resolved. <br />This concludes the Division's review of your second adequacy review response letter and proposed <br />revised pages. The Division is required to issue a decision on the application by November 4, 2016. All <br />of the adequacy review items will need to be addressed to the satisfaction of the Division prior to the <br />approval of the TR. If you need additional time to address the Division's concerns, please request an <br />extension of the decision date. <br />If you have any questions feel free to contact me at (303) 866-3567, extension 8120. <br />Sincerely, <br />/ ax \ <br />Jared Ebert <br />Environmental Protection Specialist III <br />Cc: Brian Watterson, PSCM via e-mail, <br />Jerry Nettleton, PSCM via e-mail <br />