Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02608.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 1  <br />SECTION 02608.0 PIPE BOLLARDS  <br />1. PART 1:  GENERAL  <br />1.1. Summary  <br />Pipe guards shall consist of steel pipe backfilled with concrete.  <br />1.2. Related Sections  <br />Refer to the following Sections for related work:  <br /> Section 03300.0 ‐ Cast‐in‐Place Concrete  <br />1.3. Submittals  <br />A. CONTRACTOR shall abide by all qualification and submittal requirements in Section  <br />01300.0.  <br />B. CONTRACTOR  shall  provide  product data  to  allow  evaluation  by  MANAGER  and  <br />CERTIFYING ENGINEER.  <br />1.4. Tolerances  <br />Pipe bollards shall be constructed and placed as shown on the DRAWINGS.  <br />1.5. Quality Assurance  <br />Any  work  found  unsatisfactory  or  any  work  disturbed  by  subsequent  operations  before  <br />acceptance is granted shall be corrected by CONTRACTOR as directed by MANAGER.  <br />2. PART 2:  PRODUCTS  <br />2.1. Materials  <br />A. Cast‐in‐place concrete used to fill pipe bollards shall be concrete as specified in Section  <br />03300.0.  <br />B. Pipe shall be 36 kips per square inch (ksi) standard steel pipe, with a nominal diameter  <br />of 6‐inches, and a minimum wall thickness of 0.28‐inches.  <br />3. PART 3 SUMMARY  <br />3.1. Execution  <br />A. Install pipe bollards to depths and in locations as shown on DRAWINGS.  <br />B. Backfill pipe bollards with lean concrete to the lines and grades shown on DRAWINGS.