Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 9  <br />shall then be scarified, as needed, to provide a good bond between the foundation and  <br />fill materials.  <br />3.6. Fill Placement  <br />A. The following general guidelines shall be followed except as noted elsewhere in this  <br />Section.  <br />1. No fill materials shall be placed until the foundation and subgrade preparations  <br />have  been  completed  as  specified herein,  in  Article  3.05  of  this  Section.  The  <br />procedures  for  fill  placement  shall  be  approved  by MANAGER and CERTIFYING  <br />ENGINEER prior to start of fill placement.  <br />2. No brush, roots, sod, frozen material, or other deleterious or unsuitable materials  <br />shall be incorporated in the fills. The suitability of all materials intended for use in  <br />the fill shall be subject to approval by MANAGER and CERTIFYING ENGINEER.  Fill   <br />placement  shall  be  temporarily  stopped  by CONTRACTOR due  to  weather  <br />conditions, if materials and installation do not meet the SPECIFICATIONS, at no cost  <br />to CC&V. Fill shall not be placed upon frozen material, such as snow or ice.  <br />3. If the surface of the prepared foundation or the surface of any layer of the fill is too  <br />dry or too smooth to bond properly with the layer of material to be placed thereon,  <br />it shall be moisture‐conditioned and/or worked with harrow, scarifier teeth, disc, or  <br />other  suitable  equipment  to  provide  a  satisfactory  bonding  surface  before  fill  <br />material is placed thereon. If the surface of the prepared foundation or the rolled  <br />surface of any layer is excessively wet for fill materials to be placed thereon, it shall  <br />be removed and allowed to dry or worked with a harrow, scarifier teeth, disc, or  <br />other suitable equipment to reduce the moisture content to an acceptable level or  <br />meet  project  specifications  as  determined  by MANAGER and CERTIFYING  <br />ENGINEER.  It  shall  then  be  compacted  before  the  next  layer  of  fill  material  is  <br />placed. Determination of such dry or wet conditions shall be made by CERTIFYING  <br />ENGINEER.  <br />4. The distribution of materials shall be such that the fill is free from voids, lenses,  <br />pockets, streaks, or layers of material differing substantially in texture or gradation  <br />from the surrounding material. The material of a fill shall be as described in Article  <br />2.01 of this Section.  <br />5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the entire fill  <br />surface shall be at or near the same elevation at all times during construction. At all  <br />times during construction, the surface of the fill shall be graded and maintained by  <br />the CONTRACTOR to  prevent  ponding  of  water  and  to  allow  for  storm  water  <br />drainage.  <br />6. Except  as  otherwise  specified  or  approved  by MANAGER and CERTIFYING  <br />ENGINEER, the CONTRACTOR shall dump and spread fill in such a manner so that