My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewmontâCripple Creek & Victor Gold Mine <br />Technical Specification No. 01400.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 1 <br />SECTION 01400.1 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />1. PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of <br />the earthworks (soils) components of the valley leach facility at the Cresson Project, Teller <br />County, Colorado. This program has been developed to assure that the construction of the soil <br />components are in compliance with the project SPECIFICATIONS and to demonstrate that the <br />regulatory requirements for the construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. This plan <br />also provides the means for resolution of problems that may occur during construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the <br />quality control (QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to <br />provide independent third party verification and testing, to demonstrate that the CONTRACTOR <br />has met its obligations in the supply and installation of earthwork (soils) materials according to <br />the design, project SPECIFICATIONS, contractual, and regulatory requirements. Quality control <br />is provided by CONTRACTOR and refers to those actions taken by the CONTRACTOR to ensure <br />that materials and workmanship meet the requirements of the DRAWINGS and <br />SPECIFICATIONS. <br />2. PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including their <br />responsibilities and qualifications. <br />2.1. CC&V <br />In this CQA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.2. Manager <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor <br />Gold Mining Company. MANAGER is the official representative of CC&V and is responsible for <br />all construction activities including oversight and direction during construction. MANAGER is <br />also responsible for coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction <br />and resolution meetings. As communications coordinator, MANAGER will serve as a liaison
The URL can be used to link to this page
Your browser does not support the video tag.