Laserfiche WebLink
Peabody Sage Creek Mining, LLC. <br />Page 2 <br />October 25, 2016 <br />4. Item No. 4 is considered addressed. <br />5. Item No. 5 is considered addressed. <br />New Adequacy Review Items <br />6. Table 2.04.7-T 11 submitted with the adequacy response letter was revised to not include the <br />checkmarks that indicate when flow rate will be monitored at the surface water monitoring sites. <br />Please update this table to indicate when flow rate will be monitored. <br />This concludes the Division's review of your adequacy review response letter and proposed revised <br />pages. The Division is required to issue a decision on the application by November 4, 2016. All of the <br />adequacy review items will need to be addressed to the satisfaction of the Division prior to the approval <br />of the TR. If you need additional time to address the Division's concerns, please request an extension of <br />the decision date. <br />If you have any questions feel free to contact me at (303) 866-3567, extension 8120. <br />Sincerely, <br />6Y-V,�— <br />Jared Ebert <br />Environmental Protection Specialist III <br />Cc: Brian Watterson, PSCM via e-mail <br />Jerry Nettleton, PSCM via e-mail <br />