My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-20_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2016-10-20_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 12:57:06 PM
Creation date
10/21/2016 10:49:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
10/20/2016
Doc Name
Quarterly Waste Bank Inspection Report
From
Moutain Coal Company, LLC
To
DRMS
Annual Report Year
2016
Report Quarter_Month
3
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j4anthrrt anb ,�Nsav�atvs <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Tuesday, 8/9/16 <br />Arrive Time: 10:30 AM <br />Depart Time: <br />Project Name: RPE <br />Weather: Clear, breezy <br />Project Number: M16001MT <br />Temp: <br />Client: Mountain Coal <br />Client Representative: Ty Hyatt <br />General Contractor: <br />Supervisor: <br />Specialty Contractor: Beavers <br />Construction <br />Specialty Superintendent or Foreman: Bill Chesnik <br />Source of Fill Material: Wash plant <br />Plans and Specs: <br />Prepared by: Dated: <br />Contractor's Equipment Used: Watertruck, haul trucks, dozer, excavator, loader <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On -Site to: Ty Hyatt <br />Expected Conditions Observed: yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: <br />If yes, who was contacted? <br />Follow-up from Prior Retests Performed: No <br />Visit: <br />Concerns for Next Visit: Retests Needed: No <br />Other personnel contacted on-site: name/firm <br />Notes: <br />1 performed nuclear field density tests as requested by Ty Hyatt of material being placed for fill on the RPEE. Ty <br />showed the technician the area that was prepared and ready for testing. Lambert and Associates' technician chose the <br />test locations within the area that was ready for testing. Please refer to the these results sheets for approximate test <br />locations and test results. The test results indicate only the relative compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes <br />
The URL can be used to link to this page
Your browser does not support the video tag.