Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 98 of 123 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0.4344 <br />Adjusted unit production: 608.16 LCY/hr <br />Adjusted fleet production: 608.16 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.354/LCY <br />Total job time: 18.49 Hours <br />Total job cost: $3,979 <br />(1 SHIFT/DA <br />T HB <br />T HB <br />T HB <br />AT) <br />CIRCES Cost Estimating Software <br />