My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:36:40 AM
Creation date
10/20/2016 9:44:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
8/29/2016
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 <br />BULLDOZER WORK <br />Task description: King I - push ripped waste to tipple highwall <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Initial Volume: 3,794 <br />Swell factor: 1.000 <br />Loose volume: 3,794 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />Volume from Task 002, 20% swell <br />Cat Handbook <br />200 feet <br />491.9 LCY/hr <br />Loose stockpile 1.2 <br />7,400 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Page 8 of 123 <br />Abbreviation: None <br />Filename: C035-003 <br />Job Condition Correction Factor <br />Utilization % <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper op. Cost/Hour: <br />$7.46 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $222.73 <br />0.830 <br />(1 SHIFT/DAY) <br />Total Fleet Cost/Hour: $222.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,794 <br />Swell factor: 1.000 <br />Loose volume: 3,794 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />Volume from Task 002, 20% swell <br />Cat Handbook <br />200 feet <br />491.9 LCY/hr <br />Loose stockpile 1.2 <br />7,400 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Page 8 of 123 <br />Abbreviation: None <br />Filename: C035-003 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.200 <br />(CAT HB <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.