Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 38 of 123 <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(% <br />Total Res <br />%(f <br />Velocity <br />m <br />Travel Time <br />(min) <br />1 <br />200.00 <br />0.00 <br />5.00 <br />5.00 <br />2814-7J0.097 <br />Loading Tool unit <br />Production 494.19 <br />Truck Unit Production <br />269.47 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.097 minutes <br />Total Truck Cycle Time: 2.540 minutes <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 447.32 <br />Adjusted single truck/loader team production: 410.18 <br />Adjusted multiple truck/loader team production: 410.18 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.607 /LCY <br />Total job time: 3.03 <br />Total job cost: $755 <br />410.18 <br />LCY/Hour <br />223.66 <br />LCY/Hour <br />2 <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />