Laserfiche WebLink
King Mines C 198103 5 Midterm Review No. 7 <br />TRUCK/LOADER TEAM WORK <br />Task description: King I - Haul topsoil to post -law refuse area <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 017 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 10-12 c , 6x4 <br />-Loader: CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 36 of 123 <br />Abbreviation: None <br />Filename: C035-017 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Rnnnort Rnuinment MaintPnancv Rnninmant <br />Total work team cost/hour: $248.95 <br />MATERIAL OUANTITIES <br />Initial volume: 871 CCY Swell factor: 1.429 <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.42 LCY <br />Truck Bed (volume,) Basis: <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$21.63 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$38.09 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$96.85 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: IWork: <br />$248.95 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $248.95 <br />MATERIAL OUANTITIES <br />Initial volume: 871 CCY Swell factor: 1.429 <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.42 LCY <br />Truck Bed (volume,) Basis: <br />