Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 33 of 123 <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.422 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.1833 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />156.28 LCY/hr <br />156.28 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.377/LCY <br />Total job time: <br />Total job cost: <br />39.02 Hours <br />$8,400 <br />