Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4739 <br />Adjusted unit production: <br />Adjusted fleet production: <br />404.05 LCY/hr <br />404.05 LCY/hr <br />JOB TE%JE AND COST <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.533/LCY <br />Total job time: <br />8.11 Hours <br />Total job cost: <br />$1,745 <br />Page 27 of 123 <br />