Laserfiche WebLink
King Mines C 1981035 Midterm Review No. 7 Page 18 of 123 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />(%) ((fpm) <br />Travel Time <br />(min) <br />Haul Distance (Ft) <br />Grade (%) <br />1 <br />1100.00 <br />-6.00 <br />5.00 <br />-1.00 2938 <br />0.444 <br />Haul Time: 0.444 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel Time <br />m <br />(min) <br />1 <br />1100.00 <br />6.00 <br />5.00 <br />11.00 <br />1584 <br />0.702 <br />Return Time: 0.702 <br />minutes <br />Total Truck Cycle Time: 3.431 <br />minutes <br />Loading Tool unit <br />Production 494.19 <br />LCY/Hour Adjusted for job efficiency: <br />410.18 LCY/Hour <br />Truck Unit Production <br />199.49 <br />LCY/Hour Adjusted for job efficiency: <br />165.58 LCY/Hour <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 331.15 LCY/Hour <br />Adjusted single truck/loader team production: 331.15 LCY/Hour <br />Adjusted multiple truck/loader team production: 331.15 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 3.19 <br />Hours <br />Unit cost: $0.752 <br />/LCY Total job cost: $795 <br />