Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 120 of 123 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.600 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.3369 <br />Adjusted unit production: 156.42 LCY/hr <br />Adjusted fleet production: 156.42 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.5771LCY <br />Total job time: 3.00 Hours <br />Total job cost: $270 <br />1 SHIFT/DAY) <br />'AT <br />'AT <br />'AT <br />(PA <br />CIRCES Cost Estimating Software <br />