Laserfiche WebLink
Borehole Worksheet Cont'd <br />Return Route: <br />Task # TTT Page 106 of 123 <br />Haul Time: 1.158 minutes <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />M <br />Total Res <br />(% <br />Velocity <br />rn <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />-2.00 <br />4.00 <br />2.00 <br />2905 <br />0.723 <br />Loading Tool unit <br />Production 504.90 <br />Truck Unit Production <br />198.89 <br />Optimal No. of Trucks: 3 <br />Return Time: 0.723 <br />Total Truck Cycle Time: 4.589 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 330.15 <br />Adjusted single truck/loader team production: 330.15 <br />Adjusted multiple truck/loader team production: 330.15 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.244 /LCY <br />minutes <br />minutes <br />419.06 <br />LCY/Hour <br />165.08 <br />LCY/Hour <br />2 <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 101.93 Hours <br />Total job cost: $41,867 <br />CIRCES Cost Estimating Software <br />