Laserfiche WebLink
footprint of the topsoil storage area will be reseeded during re- vegetation. <br />XX) Concrete Truck Wash -Out: This small bermed area is to collect <br />material that is washed from trucks which deliver concrete to the site. <br />YY) Sediment Pond and Diversion Ditches: The sediment pond is not <br />intended as permanent feature of the mine site, but will remain intact <br />until the site has been successfully reclaimed. <br />ZZ) Cattle Guard: The cattle guard will either be removed or cut up for <br />scrap or offered to the surface grazing lease holder of the area. <br />AAA) Portable Offices and Storage Containers: Until the Executive <br />Offices /Parts Warehouse /Bath House Building is completed, several <br />portable offices and storage containers will be utilized. These units are <br />leased from a 3rd party supplier. <br />BBB) Waterline to Connect to Huntington Ranch Waterline: The <br />waterline will be buried a minimum of 4 feet deep to avoid freezing. The <br />waterline will be left in place during the reclamation phases to supply <br />water to the site for plant germination and dust control. Upon final <br />reclamation, the valve feeding the pipe will be closed. There are no plans <br />to remove the buried portions of the pipe for reclamation purposes. The <br />surface of the field, once the original trench has been back - filled, will be <br />re- seeded using the approved seed mix. <br />CCC) Equipment Storage Area: A small area just north of the shop used <br />to store machinery or supplies. <br />GCC Energy, LLC <br />Section 2.05.4 <br />Page 6 <br />King II Mine <br />March, 2011 oo#4 ,3 3 <br />