Laserfiche WebLink
Loader Worksheet Cont’d Task # 030 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br />Total Travel Time: 0.0076 minutes <br />Total Cycle Time: 0.4826 minutes <br />Load Bucket Capacity <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: 1.65 LCY <br />Job Condition Correction Factors <br />Site Altitude: 7980 feet <br /> Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: 205.16 LCY/Hour <br />Adjusted Hourly Unit Production: 161.77 LCY/Hour <br />Adjusted Hourly Fleet Production: 161.77 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 2.05 Hours <br /> <br />Unit cost: <br /> <br />$0.463 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$154 <br />