Laserfiche WebLink
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />WHEEL LOADER – LOAD AND CARRY WORK <br /> <br />Task description: Recontour 10 pads (25’ x 50’) <br />Site: Kate Permit Action: Initial Bond Permit/Job#: P2016019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 020 State: Colorado Abbreviation: None <br />Date: 10/18/2016 County: Custer Filename: P019-020 <br />User: TC1 <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 446D Horsepower: 101 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $14.20 NA <br />Operating Cost/Hour: $22.17 100 <br />Operator Cost/Hour: $38.60 NA <br />Total Unit Cost/Hour: $74.97 <br />Total Fleet Cost/Hour: $74.97 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 450 CCY Swell factor: 1.230 <br />Loose volume: 554 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Cycle Time Factors Factor (min.) Source <br />Material: Bank or broken material 0.04 0.040 (Cat HB) <br />Stockpile: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br />Truck Ownership: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: 0.000 minutes <br /> Adjusted Basic Cycle Time: 0.475 minutes <br />Rolling Resistance – Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 1” tire penetration 4.0 <br />Return: Rutted dirt, little maintenance, no water, 1” tire penetration 4.0 <br />Haul and Return Time <br /> Length <br />(feet) <br />Grade Res. <br />(%) <br />Rolling <br />Res. (%) <br />Total Res. <br />(%) <br />Travel Time <br />(minutes) Source <br />Haul Route: 25 -5.00 4.00 -1.00 0.0106 (Cat HB) <br />Return Route: 25 5.00 4.00 9.00 0.0272 (Cat HB) <br />Unadjusted Basic Cycle Time (load, dump, maneuver): 0.475 minutes