Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> September 2016 Monthly Report <br /> Page 3 <br /> Table 2—September 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> feet Water ft <br /> P I O 9/27/16 57.66 58.30 0.64 <br /> PH 9/27/16 41.38 41.80 0.42 <br /> P 12 9/27/16 41.69 41.71 0.02 <br /> P13 9/27/16 40.99 41.34 0.35 <br /> P14 9/27/16 Dry 41.24 0.00 <br /> P15 9/27/16 40.85 41.10 0.25 <br /> Table 3 below provides the calendar year 2016 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr.Larry Fiske at(303)837-5676. <br /> incerely, <br /> J lio F.Madrid <br /> S . Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />