My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 9:00:53 AM
Creation date
10/19/2016 10:08:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 <br />Postmining Channel Construction Task No. 024 <br />Page 48 of 123 <br />11 -Feb - <br />Date : 15 Permit C1981035 <br />Site: <br />King Coal Mines <br />User: SLB <br />State : Colorado <br />County: <br />La Plata <br />Agency Name: Colorado Division of Reclamation, Mining <br />and Safety <br />Permit <br />Action: Permit Renewal 6 <br />Task Description: Construct <br />Post -Mining Drainage Channels <br />W <br />Slope Surf <br />Channel L D W (bot) <br />Slopes <br />(Top) <br />V/LF <br />V tot <br />Riprap <br />L Area <br />Riprap V <br />(ft) (ft) (ft) <br />(X:1) <br />(ft) <br />(CY) <br />(CY) <br />(ft) (sf) <br />CY <br />A 100 1.500 1.0 <br />2.0 <br />7.0 <br />0.2222 <br />22 <br />2.50 600 <br />0 <br />B 330 1.500 2.0 <br />2.0 <br />8.0 <br />0.2778 <br />92 <br />4.27 3,480 <br />0 <br />C 350 1.000 2.0 <br />2.0 <br />6.0 <br />0.1481 <br />52 <br />4.12 3,586 <br />0 <br />D 770 1.000 1.0 <br />2.0 <br />5.0 <br />0.1111 <br />86 <br />2.24 4,214 <br />0 <br />E 190 1.750 1.0 <br />2.0 <br />8.0 <br />0.2917 <br />55 <br />2.66 1,200 <br />38 <br />F 35 1.750 1.0 <br />2.0 <br />8.0 <br />0.2917 <br />10 <br />2.66 221 <br />7 <br />Totals 1,775 <br />317 <br />13,300 <br />45 <br />Riprap <br />Materials Needed: Geotextile (SY): <br />330 <br />(CY): <br />45.0000 <br />45 <br />Excavation (CY): <br />317 <br />Material <br />Costs: Geotextile (SY): <br />$ 2.22 <br />Riprap (CY): <br />$53.25 <br />Excavation (CY): <br />$ 3.57 <br />Means Reference 33 46 26.10 0110 <br />31 37 13.10 0100 <br />31 23 16.42 0310 <br />Totals: Geotextile (SY): <br />$ 732.60 <br />Riprap (CY): <br />$2,381.97 <br />Excavation (CY): <br />$ 1,131.41 <br />Hours: Geotextile (SY): <br />3.77 <br />Riprap (CY): <br />5.77 <br />Excavation (CY): <br />9.39 <br />7.75 <br />33.75 <br />87.5 SY/HR <br />CY/HR <br />CY/HR <br />Total Post -Mining Channel Reconstruction hours: <br />18.93 <br />Total Post -Mining Channel Reconstruction Cost: <br />$ 4,245.98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.