Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 <br />Spoil pile: <br />0.800 <br />(SSD -AC) <br />Push gradient: <br />1.115 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5284 <br />Adjusted unit production: <br />Adjusted fleet production: <br />259.92 LCY/hr <br />259.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.828/LCY <br />Total job time: 1.54 Hours <br />Total job cost: $331 <br />Page 20 of 123 <br />