My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (36)
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 7:20:43 AM
Creation date
10/19/2016 10:03:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Licenses and Permits
Section_Exhibit Name
KI Appendix 02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC Energy, LLC Colorado Department of Public Health and Environment <br />Permit No. 09LP0202F Air Pollution Control Division <br />Final Approval — Modification 1 <br />refer to the most recent annual fee invoice to determine the APEN expiration date for each <br />emissions point associated with this permit. For any questions regarding a specific expiration date <br />call the Division at (303)- 692 -3150. <br />5) This facility is classified as follows: <br />Applicable <br />Requirement <br />Status <br />operating Permit <br />Minor Source for PM, PM 10 and PM2.5 <br />PSD <br />Minor Source for PM, PM 10 and PM2.5 <br />6) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be <br />found at the website listed below: <br />htta: / /ecfr.opoaccess.gov/ <br />Note: For NSPS Subpart Y applicability purposes, all the affected facilities covered by <br />this permit are considered as existing facilities, which were constructed or modified <br />prior to April 28, 2008. <br />7) The permit holder is required to pay fees for the processing time for this permit. An invoice for <br />these fees will be issued after the permit is issued. The permit holder shall pay the invoice within <br />30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit <br />(Reference: Regulation No. 3, Part A, Section VI.B.) <br />8) If this permit specifically states that final approval has been granted, then the remainder of this <br />condition is not applicable. Otherwise, the issuance of this construction permit does not provide <br />"final" authority for this activity or operation of this source. Final approval of the permit must be <br />secured from the Division in writing in accordance with the provisions of 25- 7- 114.5(12)(a) C.R.S. <br />and Regulation No. 3, Part B, Section III.G. Final approval cannot be granted until the operation <br />or activity commences and has been verified by the Division as conforming in all respects with the <br />conditions of the permit. Once self - certification of all points has been reviewed and approved by <br />the Division, it will provide written documentation of such final approval. Details for obtaining <br />final approval to operate are located in the Requirements to Self - Certify for Final Approval <br />section of this permit. <br />9) Unless specifically stated otherwise, the general and specific conditions contained in this permit <br />have been determined by the Division to be necessary to assure compliance with the provisions <br />of Section 25- 7- 114.5(7)(a), C.R.S. <br />10) Each and every condition of this permit is a material part hereof and is not severable. Any <br />challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and <br />upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked <br />at any time prior to self - certification and final authorization by the Division on grounds set forth in <br />the Colorado Air Pollution Prevention and Control Act and regulations of the AQCC including <br />failure to meet any express term or condition of the permit. If the Division denies a permit, <br />conditions imposed upon a permit are contested by the applicant, or the Division revokes a <br />permit, the applicant or owner or operator of a source may request a hearing before the AQCC for <br />AIRS ID: 067/1103 Page 6 of 11 <br />Part 60: Standards of Performance for New Stationary Sources <br />NSPS <br />60.250- 60.258 <br />Subpart Y <br />NSPS <br />Part 60, Appendixes <br />Appendix A — Appendix I <br />Note: For NSPS Subpart Y applicability purposes, all the affected facilities covered by <br />this permit are considered as existing facilities, which were constructed or modified <br />prior to April 28, 2008. <br />7) The permit holder is required to pay fees for the processing time for this permit. An invoice for <br />these fees will be issued after the permit is issued. The permit holder shall pay the invoice within <br />30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit <br />(Reference: Regulation No. 3, Part A, Section VI.B.) <br />8) If this permit specifically states that final approval has been granted, then the remainder of this <br />condition is not applicable. Otherwise, the issuance of this construction permit does not provide <br />"final" authority for this activity or operation of this source. Final approval of the permit must be <br />secured from the Division in writing in accordance with the provisions of 25- 7- 114.5(12)(a) C.R.S. <br />and Regulation No. 3, Part B, Section III.G. Final approval cannot be granted until the operation <br />or activity commences and has been verified by the Division as conforming in all respects with the <br />conditions of the permit. Once self - certification of all points has been reviewed and approved by <br />the Division, it will provide written documentation of such final approval. Details for obtaining <br />final approval to operate are located in the Requirements to Self - Certify for Final Approval <br />section of this permit. <br />9) Unless specifically stated otherwise, the general and specific conditions contained in this permit <br />have been determined by the Division to be necessary to assure compliance with the provisions <br />of Section 25- 7- 114.5(7)(a), C.R.S. <br />10) Each and every condition of this permit is a material part hereof and is not severable. Any <br />challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and <br />upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked <br />at any time prior to self - certification and final authorization by the Division on grounds set forth in <br />the Colorado Air Pollution Prevention and Control Act and regulations of the AQCC including <br />failure to meet any express term or condition of the permit. If the Division denies a permit, <br />conditions imposed upon a permit are contested by the applicant, or the Division revokes a <br />permit, the applicant or owner or operator of a source may request a hearing before the AQCC for <br />AIRS ID: 067/1103 Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.