My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 12:54:45 PM
Creation date
10/19/2016 9:31:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
8/29/2016
Section_Exhibit Name
KI 2.03.5 Compliance Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.5 - COMPLIANCE INFORMATION <br />Neither GCC Energy, LLC nor persons controlled or under common control has had a <br />Federal or State mining permit for surface or underground mining operations <br />suspended or revoked in the last five year period since date of issuance of CDRMS <br />Mining Permit C-1981-035. <br />Neither GCC Energy, LLC nor persons controlled or under common control has <br />forfeited a mining bond or similar security deposited in lieu of bond. <br />One violation has been issued to GCC Energy, LLC during the three years prior to <br />this application. <br />CV -2012-003 was issued by the Colorado Division Mining, Reclamation and Safety, <br />on April 11, 2012, for using of coal mine waste to backfill the highwall at King I as <br />was approved in the King I permit document. The Notice of Violation was served to <br />Tom Bird at GCC Energy, LLC, MSHA ID # 05-04864. GCC met abatement step 1 on <br />August 14, 2012 with the submittal of an application for a technical revision (TR -20). <br />In fulfillment of abatement step 2, Coal Mine Waste placed improperly against the <br />King I Highwall was removed and transferred to he approved refuse pile. Step 2 was <br />abated on November 30, 2012. CV -2012-003 was terminated on December 11, 2012. <br />GCC Energy, LLC King I Mine <br />Section 2.03.5 <br />Page 1 April 30, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.