Laserfiche WebLink
-4- <br />l2_ Primary future (Post -mining) land use (check one): <br />L___I Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />ResidentiakRS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. PrtmaEy present land use check one : <br />12 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) LJ €ndustrial'Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Open mine digging material from bank with front end loader <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industria UCommerci al(1C) <br />Solid Waste Disposal(WD) <br />15. On Site Processing: W1 Crushing/Screening <br />€3.1 Briefly explain mining method (e.g. truck/shovel): <br />Removing matedal from bank with a front end loader. Dumping In a hopper that feeds a crusher or srreanar, Some malaria wit! be P't Run So It will be loaded nto a truck or trallerfrom hank or face <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />There is not much gravel in th axe inermited area so th_ need to move on to other property <br />is the only way to stay in business. We will move the fence and place markings around the new <br />