Laserfiche WebLink
EAST DRYING AREA <br />RESERVED FOR <br />COMPACTION <br />A <br />GOB PILE FOOT PRINT <br />SHOWS ORIENTATION OF STACKED GOB <br />WEST DRYING AREA <br />SION.. <br />r• vE r <br />DCKPIL <br />TCR '1 <br />f ACT/VEGOB <br />ND COMPACTION EA 8.2 Ac / / / / / / / �✓ / , <br />POND <br />/ // > D AREA BOUNDARY <br />EST GOB WG <br />AREA - f, SECTION A—A <br />WINTER GOB STACKING PLAN <br />l No PILE OVERLAP <br />SPACE BETWEEN ROWS TO BE GRADED <br />TO ACHIEVE POSITIVE DRAINAGE. MAINTAIN <br />FLOW PATH AS NECESSARY. <br />N PROJECT: BOWIE RESOURCES, LLC <br />W E TITLE: GOB PILE #3 DRYING/PLACEMENT LOCATION <br />ONsNCH OPERATIONAL SEDIMENTATION CONTROL PLAN <br />DESIGNED BY: J.E.S. 02/27/14 DMG I.D. No. C - 1996 - 083 DWG. NAME: <br />REVISED BY: T.K.B. 09/25/15 <br />SCALE: NOT TO SCALE <br />TR -109 -VOLUME XI. 4b- 09/16 <br />