My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-12_REPORT - C1981035 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981035
>
2016-10-12_REPORT - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:25:09 AM
Creation date
10/17/2016 8:14:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Report
Doc Date
10/12/2016
Doc Name
2nd Quarter Refuse Pile Report
From
GCC Energy, LLC
To
DRMS
Annual Report Year
2016
Report Quarter_Month
2
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
DIH
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stoner engineering & Surveying <br />Engineering, Testing & Surveying <br />Date: June 24, 2016 <br />To: Tom Bird <br />Manager, Coal Services <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />(970) 385-4528 <br />From; Ryan Griglak, P.E. <br />Project Manager <br />Stoner Engineering & Surveying <br />Re: King Coal I — Quarterly Waste Pile/Embankment Inspection <br />On June 23, 2016, Ryan Griglak, P.E. visited the GCC Energy, LLC King I Mine site to conduct the <br />quarterly inspection of the coal waste pile/embankment. Mr. Griglak, P.E. has conducted <br />inspections for the placement of earthwork embankment fill material for numerous <br />commercial, residential and municipal projects in which buildings, roadways and parking <br />facilities were installed over the placed materials. <br />The condition of the perimeter ditches located along the north and south sides of the property <br />were generally in good condition. There was recent work performed along the south ditch <br />where the culvert daylights under the access road to help minimize erosion (see Pic. 1). The <br />drainage channels were generally clear of debris and there was no damage observed to any of <br />the channel sections. <br />There was only minimal stockpiled material on top of the embankment (see Pic. 2). The face of <br />the embankment was in good condition and does not show any signs of excessive erosion, <br />instability or weakness (see Pic.3). <br />There is a single trailer stored on the site near the old bath house. The only structure with any <br />proximity to the embankment material is the old bath house which is no longer utilized and is <br />abandoned. Personnel are only on-site to bring and/or place material on the embankment or <br />for mine rescue training. The mine rescue training is performed on the north side of the site <br />well away from the embankment material. The site is closed to the public and there is a locked <br />gate at the entrance to keep the public out. <br />The waste pile has been and continues to be constructed and maintained as specified in the <br />design approved by the Division of Minerals and Geology. Potential hazards to life and property <br />are minimal due to the fact that GCC has moved most of their operations to their King 11 facility. <br />P.O. Box 1163 28 South Washington Street Cortez, Colorado 81321 <br />970,565.7483 stonerenoineer@frontier.net 970.565.7704 <br />
The URL can be used to link to this page
Your browser does not support the video tag.