Laserfiche WebLink
LEGEND <br />PERMIT BOUNDARY <br />- SECTION LINE <br />PIT SHELL WITH FUTURE PIT MINING LIMITS <br />ONE-HALF MILE DISTANCE REQUIRING NOTIFICATION <br />PER RULE 4.08.4 <br />�00 DISTANCE TO STRUCTURE <br />rrS <br />90 <br />41bs MAXIMUM WEIGHT OF EXPLOSIVES PER 8 ms DELAY <br />PER RULE 4.08.4 (10) <br />w <br />N <br />S <br />rA <br />CONTOUR INTERVAL 25 FT. <br />Topo Date November 2014 <br />Coordinates in NAD27 Colorado North Zone, US Foot <br />ENGINEERS CERTIFICATION <br />1, STEVE WEIST, hereby certify that this <br />map has been reviewed by me and is true <br />and correct to the best of my knowledge and <br />information, relying on information supplied <br />by experts employed by Colowyo Coal <br />Company or qualified consultants working <br />for Colowyo Coal Company, and that I am a <br />Professional Engineer licensed in Colorado as <br />required by the provisions of C.R.S. <br />12-25-101 through C.R.S. 12-25-119. IN <br />WITNESS WHEREOF, 1 have hereunder set <br />my hand and affixed my seal. <br />PR -4 <br />Approved 8/8/2016 <br />