Laserfiche WebLink
Rationale for Recommendation to Approve 15 <br /> September 29, 2016 <br /> Applicant submitted a list of the 43 easement owners for Little Turkey Creek Road to accompany Figure <br /> C-2. The Division determined the revised Figure C-2 satisfied the requirements of Rule 6.4.3(g). <br /> 6. Concerns regarding the control of stormwater and increased potential for flooding resulting <br /> from the mining activity. Concerns for adverse impacts to the prevailing hydrologic balance for surface <br /> water resources. <br /> (W. Baker, M. Baker, S Harper, K. Rawson,M. McClurg, B. Chisnell, C Reed, N. Reed, G. Klein, C. Hancock, D.Hancock, R. Larsen, S. <br /> Larsen,M.Harvey,L.Harvey, G.McCovven,J.Moore,K Moore,M Henslee,M. Cook,J.Lawrence,R. Cadigan,J. Cadigan, C Engelage, <br /> S. Rawson, K. Blatchford, P. Blatchford, W. Dean, M. Heer, C. Heer, C. Kimble, C Bernstein, C. Lick, D. Lick, L. Rogers, J. Miller, K. <br /> Troutt,J.Salazar,Jr.,M.Hodges,K.Kay, C.S.Kay,S.LaVerne,S.Pringle,M.Junck,R.Holden, Y.Holden, C Newby,K Newby,R. Welch, <br /> S.Samson, V. Wekamp,D. Wekamp, G.Sovaiko,M.Spoor,B.Hughes,J.Kline,D.Murphy,J.Murphy,B.Simmons,S.Simmons, T.Sivonger, <br /> S.Sovaiko,J. Gard,D. Gard, C.Bruce,D.Brice,M.Harper,Joe Koscove,S.Koscove,Jack Koscove, M. Koscove) <br /> In an effort to verify compliance with C.R.S. 34-32.5-116(4)(h) and Rule 3.1.6, the application includes a <br /> surface water monitoring plan. This plan includes the installment of four surface water monitoring <br /> stations, located hydrologically up-gradient and down-gradient from the proposed mine area in the <br /> Deadman Creek and Little Turkey Creek drainages. All monitoring stations will include collection of <br /> water samples for laboratory analysis, field parameters, and streamflow measurements. <br /> Surface water quality analysis will include all required parameters from the CDPHE,WQCC—Regulation <br /> No. 32 — Classifications and Numeric Standards for Arkansas River Basin — Appendix 32-1 — Stream <br /> Classifications and Water Quality Standards Tables — Effective 0610112016, Stream Section 14d <br /> (COARUAI4D), except for Chlorophyll a, which the Division determined would not be required for this <br /> site. <br /> The Applicant is required to collect surface water quality data during five successive calendar quarters <br /> prior to commencement of mining, in order to sufficiently characterize baseline conditions at the site. At <br /> the end of the 15-month monitoring period, the Applicant will submit a final report to the Division which <br /> summarizes monitoring results. After reviewing the final report, the Division will determine whether any <br /> aspect of the monitoring plan needs to be revised. Any revisions to the approved surface water monitoring <br /> plan will be submitted for Division review and approval through either the Technical Revision or <br /> Amendment process. <br /> Additionally, the Applicant has developed a stormwater management plan which shows how runoff water <br /> from disturbed areas, stockpiled material, and operating surfaces will be managed to protect against <br /> pollution of both surface and groundwater, during and after the operation. The Division determined the <br /> stormwater management plan satisfied the requirements of Rule 6.4.7(2)(c) and the applicable <br /> performance standards of Rule 3.1. <br /> The stormwater management plan submitted in Exhibit G includes a series of ditches, sediment ponds, <br /> and culverts designed to control runoff from a 100-year, 24-hour storm event. All structures are designed <br /> using the most conservative conditions,typically the greatest disturbance area. The system design follows <br /> guidelines established by El Paso County and the City of Colorado Springs, and are in compliance with <br /> the Division of Water Resources' (DWR's) requirements. The Division determined that the stormwater <br /> management plan satisfied the requirements of Rule 3.1.5(10) and (11), Rule 3.1.6, and Rule 6.4.7. <br /> /ecolo.,p, <br /> 1313 S' emran Stine,.. Rcotr 215, DF itver, Cd ECz03 P 303.866.3567E 303.832.8106 ht'p: 'n-i i;.,;tate.co.us e W\Sp <br /> h'i t I r icec inc Icm \ Y 10� <br /> k ^!. H cb.en.00s r, Gcttie nor Rohr Li, Rar;1,�1., Exect.tr.=_D' t.ar V it; 8tai tion. Director <br />