Laserfiche WebLink
<,g <br /> e. <br /> Sec. 15, SPECIAL STIPULATIONS-Special stipulations(a)Cut- Office(SHPO),select the appropriate mitigation optigpvithin <br /> tural Resources,(b)Paleontological Resources,(c)Threatened and 48 hours of the discovery.The lessee,under guidan&^f the <br /> Endangered Species(Plants),(d)Wildlife,(e)Floodplains,(f)Ac- BLM,will implement the mitigation in a timely manner.The <br /> cess,and(g)Mine and Reclamation Plans are attached to and made a process will be ftilly documented in reports,site forms,maps, <br /> part of sodium preference right lease C00011832801. These drawings, and photographs. The BLM will forward <br /> stipulations are also imposed upon lessee's employees and agents, documentation to the SHPO for review and concurrence. <br /> The failure or refusal of any of these persons to comply with these <br /> stipulations shall be deemed a failure of the lessee to comply with the (7)Pursuant to 43 CFR 10.4(g),the lessee must notify the <br /> terms of the lease. Lessee shall require its agents,contractors,and AO,by telephone and written confirmation,immediately upon <br /> subcontractors involved in activities on this lease to include these the discovery of human remains,funerary items,sacred objects, <br /> stipulations in the contracts between and among them.The special or objects of cultural patrimony.Further,pursuant to 43 CFR <br /> stipulations maybe revised or amended,in writing,by mutual consent 10.4(c)and(d),the operator must stop activities in the vicinity <br /> of the lessor and the lessee. of the discovery and protect it for 30 days or until notified to <br /> proceed by the AO. <br /> (a) Cultural Resources. Lessee shall undertake measures in accor- <br /> dance with instructions from the authorized officer to protect cultural (b) Paleontological Resources. (1) Before undertaking any <br /> resources on the leased lands.The lessee shall not commence any activities that may disturb the surface of the leased lands,lessee <br /> surface disturbing activities until permission to proceed is given by shall employ a qualified professional paleontologist to map the <br /> the authorized officer(AO).For this cultural resources stipulation, extent of the Class I and 11 geologic formations. The <br /> the authorized officer of the BLM will be the White River Field paleontological appraisal shall be conducted as directed by the <br /> Office(WRFO)Manager, authorized officer who may require a Feld survey of all <br /> outcrops within identified Class I and Class II areas.The BLM <br /> (1)Before undertaking any activities that may disturb the surface reserves the right to designate portions of any Class I or Class <br /> of the leased lands,lessee shall conduct a cultural resource Class III It areas as unsuitable for mining under this lease due to their <br /> inventory on those lands that have not been previously inventoried sensitivity or to protect significant scientific value(s). <br /> and that may be affected by lease-related activities.The inventory <br /> shall be conducted by a qualified professional cultural resource (2)Lessee shall not knowingly disturb,alter,destroy,or take I <br /> specialist (i.e., archaeologist, historian, or historical architect, as any paleontological resources.Lessee shall immediately cease <br /> appropriate)approved by the authorized officer of the BLM and in activities in the vicinity of any paleontological specimen that is <br /> the manner specified by the authorized officer.Lessee shall submit a discovered during its operations. Lessee shall protect the <br /> report of the inventory and recommendations for protecting any resource and report the discovery to the authorized officer.A <br /> identified cultural resources to the authorized officer. paleontological specimen shall not be removed from the site <br /> until evaluated by a qualified professional paleontologist. j <br /> (2) Lessee shall protect all known cultural resource properties Operations may not proceed until specifically authorized by the i <br /> within the lease area from lease-related activities until the cultural BLM. Lessor expressly reserves title to paleontological <br /> resource mitigation measures can be implemented as part of an resources. i <br /> approved exploration plan or an approved mining plan. <br /> (3)Lessor reserves the right to conduct periodic compliance } <br /> (3)The cost of conducting the inventory,preparing reports,and checks or to have these checks conducted by a qualified <br /> carrying out mitigation measures shall be borne by the lessee. professional paleontologist during the stripping of overburden <br /> and the construction of appurtenant facilities in order to check <br /> (4)The cost of data recovery for cultural resources discovered for the existence of paleontological localities and to evaluate i <br /> during lease operations shall be borne by the lessee. their significance. <br /> (5)The lessee is responsible for informing all persons who are (4)The lessee is responsible for informing all persons who <br /> associated with the project that they will be subject to prosecution for are associated with the project operations that they will be <br /> knowingly disturbing archaeological sites or for collecting artifacts. subject to prosecution for disturbing or collecting vertebrate or <br /> other scientifically-important fossils,collecting large amounts <br /> (6) If any archaeological materials are discovered as a result of of petrified wood (over 25lbslday, up to 250lbs./year), or I <br /> operations tinder this authorization, activity in the vicinity of the collecting fossils for commercial purposes on public lands. s <br /> discovery will cease, and the BLM WRFO Archaeologist will be <br /> notified immediately. Work may not resume at that location until (5) If any paleontological resources are discovered as a s <br /> approved by the AO.The lessee will make every effort to protect the result of operations under this authorization,the lessee or any <br /> site from further impacts including looting,erosion,or other human of his agents must stop work immediately at that site, s <br /> or natural damage until BLM determines a treatment approach,and immediately contact the BLM Paleontology Coordinator,and r <br /> the treatment is completed. Unless previously determined in snake every effort to protect the site from further impacts, <br /> treatment plans or agreements, BLM will evaluate the cultural including looting,erosion,or other human or natural damage. <br /> resources and, in consultation with the State Historic Preservation Work may not resume at that location until approved by the <br /> i <br />