My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-05_REVISION - C1981008 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-10-05_REVISION - C1981008 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 1:58:48 PM
Creation date
10/11/2016 1:53:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/5/2016
Doc Name
Adequacy Review to file Memo
From
Tabetha Lynch
To
File
Type & Sequence
TR74
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />6/29/2016 <br />MW BF -61 <br />85 ft. <br />MW BF -62 <br />64 ft. <br />MW BF -63 <br />99 ft. <br />MW BF -64 <br />129 ft. <br />MW BF -65 <br />127 ft. <br />MW BF -66 <br />111 ft. <br />MW BF -67 <br />107 ft. <br />Access to wells MW BF -59 through MW BF -62 will be across a backfilled area that has not been topsoiled or <br />seeded. Access to the wells MW BF -63 through MV BF -67 will be achieved using existing two -track <br />access. One well MW BF -63 will be access across reclamation on a new two -track road. All wells will be <br />installed on Elk Ridge deeded property. Drill pads (not a pad as you would normally see associated with a <br />drill rig) will entail pushing up the topsoil into a windrow in a space big enough for the rig. There will not be <br />any cut/fill associated with the drilling location. Also, there will not be any drilling pit(s) to support the <br />drilling. All drilling fluids etc., will be contained and haul offsite. <br />Based on the information provided by the operator a cost estimate was conducted and acknowledged by the <br />operator. No additional information or edits to the revised pages were found to be necessary and an adequacy letter <br />was not sent to the operator. The proposed decision of an approval of TR 74 was made on Oct 5, 2016. <br />
The URL can be used to link to this page
Your browser does not support the video tag.