Laserfiche WebLink
toner Engineering 5urve�ing <br />Engineering, Testing & Surveying <br />The drainage ditches were found to be in generally good condition and clean of debris (see Pic. <br />2 & 3). All ditches should be inspected and repaired as necessary, especially after storm events. <br />The culvert pipes on the site were in good condition overall. The culvert under the main drive <br />west of the scale house noted in the previous report had been cleaned out though recent <br />storms have resulted in limited erosion at the entrance (see Pic 4). The west clear water ditch <br />has experienced some sedimentation near this area and needs cleaning to prevent excessive <br />runoff from overtopping and potentially resulting in erosion to the main roadway (see Pic. 5). <br />The drainage features for the King II site are functioning as designed and are being maintained <br />in accordance with the approved plans. <br />Please let me know if you have any additional questions or concerns in regards to the issues <br />discussed. <br />Sincerely, <br />Ryan M. Griglak, P.E. <br />Project Manager <br />P.O. Box 1163 28 South Washington Street Cortez, Colorado 81321 <br />970.565.7483 stonerenaineer c@frontier.net 970.565.7704 <br />