Laserfiche WebLink
PERMIT#:M-1991-147 <br /> INSPECTOR'S INITIALS:TOD <br /> INSPECTION DATE:June 17,2016 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS.If a Possible <br /> Violation is indicated, you will be notified under separate cover as to w hen the Mined Land Reclamation <br /> Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Financial Warranty <br /> PROBLEM: The financial warranty is not adequate to reclaim the site in accordance with the approved <br /> reclamation plan. This is a failure to maintain the proper financial warranty amount to complete reclamation of the <br /> affected lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act. The new amount of required financial warranty <br /> will be $41,800, which is $36,800 more than the current required financial warranty of $5,000. <br /> CORRECTIVE ACTIONS: The deficit in financial warranty amount on deposit with the State is cited as a <br /> problem and must be corrected by September 6, 2016, by submitting the additional bond amount of$36,800. <br /> CORRECTIVE ACTION DUE DATE: 9/06/16 <br /> INSPECTION TOPIC: Revegetation <br /> PROBLEM: Musk thistle and common mullein are present within or have volunteered into the permit area and <br /> are becoming established. This is a problem for failure to employ weed control methods for a state listed noxious <br /> weeds species within the permitted area, and to reduce the spread of weeds to nearby areas as required by Section <br /> 3.1.10 (6)of the Rule. <br /> CORRECTIVE ACTIONS: The Operator shall either implement a weed control plan, provide photographic <br /> evidence demonstrating that the noxious weeds have been eradicated, OR develop a weed control and management <br /> plan in accordance with Rule 3.1.10 (6). This plan should be developed in consultation with the county extension <br /> agency, or weed control district office and should include specific control measures to be applied, a schedule for <br /> when control measures will be applied and a post-treatment monitoring plan. This weed control plan shall be <br /> submitted to the Division as a Technical Revision to the approved plan with the appropriate Technical Revision fee <br /> of$216.00 by the corrective action date. <br /> CORRF.C"hIVE ACTION DUE DATE: 9/06/16 <br /> INSPECTION TOPIC: Signs & Markers <br /> PROBLEM: The affected area boundary markers are missing or incorrectly placed or un-identifiable. This is a <br /> problem for failure to maintain boundary markers around the affected area as required by Section 3.1.12(2) of the <br /> rule. <br /> CORRECTIVE ACTIONS: The approved affected land boundary must be marked in the field to adequately <br /> identify the boundary pursuant to Rule 3.1.12(2). Along with marking the approved affected land boundary in the <br /> field, the Operator shall submit a map showing the following; the approved affected land boundary, the disturbed <br /> lands, and the land owned by the Operator. The map must be prepared by a registered land surveyor. Upon receipt <br /> and review of the map the Division will follow up accordingly with the Operator properly to rectify any issues that <br /> may be raised by the mapping. <br /> CORRECTIVE ACTION DUE DATE: 9/06/16 <br /> Page 2 of <br />