Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclaim the Belvedere Quarry <br /> Site: Belvedere Stone Quarry Permit Action: 2016 inspection Permit/Job#: M1991147 <br /> PROJECT IDENTIFICATION <br /> Task#: 999 State: Colorado Abbreviation: None <br /> Date: 6/23/2016 County: Douglas Filename: M147-999 <br /> User: TOD <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Create Bench EXCAVATE 1 33.61 $6,476.00 <br /> 002 Backfill and Grade Highwall DOZER 1 69.91 $8,972.00 <br /> 003 Spread 4 inches of topsoil over 4 acres DOZER 1 56.19 $7,211.00 <br /> 004 Revegetation of the quarry REVEGE 1 36.00 $6,299.00 <br /> 005 Mobilization and demobilization MOBILIZE 1 4.84 $3,641.00 <br /> SUBTOTALS: 200.55 $32,599 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $658.50 <br /> Performance bond: 1.05 Total= $342.29 <br /> Job superintendent: 40.00 Total= $2,979.20 <br /> Profit: 10.00 Total= $3,259.90 <br /> TOTAL O&P= $7,219.89 <br /> CONTRACT AMOUNT(direct+O&P)= $39,838.89 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $1,991.94 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $9,231.83 <br /> TOTAL BOND AMOUNT(direct+indirect)= $41,830.83 <br />