My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-06_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2016-10-06_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2016 11:13:44 AM
Creation date
10/7/2016 8:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
10/6/2016
Doc Name
Quarterly Fill Certification
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2016
Report Quarter_Month
3
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 29, 2016 <br />2.5 Revegetation <br />Topsoil activities did occur this quarter. The majority of the fill has been covered with the final <br />layer of topsoil. Topsoil has been placed from the 7740' elevation down to the 7615' elevation on <br />the south half of the fill and on the 7630' elevation down to the 7615' elevation on the north half <br />of the fill. There are a few topsoil piles located on the fill. Additional work needs to be done to <br />smooth out the topsoil and prepare it for seeding. <br />Photograph 7: Topsoil Placement Looking Southeast (9/29/2016) <br />Photograph 8: Topsoil Placement Looking North (9/29/2016) <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.