September 29, 2016 <br />Photograph 2: North Site above the 7350 Bench Elevation (9/27/2016) <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />Topsoil and organic material removal activities were not conducted during the quarter. <br />2.2 Placement of Underdrainage Systems <br />The underdrainage system was completed in the first quarter of 2010; additional work on this <br />system is not anticipated. During the time of the inspection, there was stagnant water but no <br />visible water flow (Photograph 3). <br />2.3 Installation of Surface Drainage Systems <br />Both the north and south surface drains were inspected (Photographs 4 and 5). At the time of <br />the inspection there was no water flow in either drainage. The upper drain was inspected and <br />was in excellent condition. <br />2.4 Placement and Compaction of Fill Materials <br />There was no placement of material or contour work done this quarter on the dump. <br />3 <br />