Laserfiche WebLink
September 29, 2016 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter 2016 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer <br />Trapper Mining, Inc. <br />1 <br />P......c6y,, <br />4e, *x <br />.s • <br />F 43864 yt�= <br />10-3-16 <br />1 <br />00 <br />ION A, <br />2 <br />3 <br />3 <br />3 <br />3 <br />3 <br />6 <br />7 <br />