Laserfiche WebLink
�-'f at) TRAPPER MINING INC. <br />CRAIG, COLORADO <br />OMSION OF RECLAMATION HORSE GULCH FILL <br />MINING AND84ETY QUARTERLY FILL CERTIFICATION <br />Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br />accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br />Horse Gulch Fill construction. This quarterly inspection was conducted on September 27 and <br />29 of 2016. The fill was inspected for stability, and no appearance of instability, structural <br />weakness, or other hazardous condition was observed during inspection. Construction during <br />this quarter has been under my supervision, and to the best of my knowledge and belief, has <br />been consistent with the design approved by the Colorado Division of Reclamation, Mining, and <br />Safety. <br />Ill) Q/ill <br />40mf� <br />ry h 43864 co: f <br />Tonia Marie Perkins cc <br />CO PE 43864^6, •� %�tC <br />to /'3/Z0/( <br />Date�� <br />